The machine you need.The suppliers, already checked.
You are not limited to one factory’s catalogue. Tell us the job — load, aisle, power, destination — and it goes out to the Chinese manufacturers who actually build that machine. The shortlist comes back quoted on one identical specification, and we stay on the order through packing, spares and export.
- Every option shows its region and what it can prove — not just a price
- Every option quoted on the same specification, so the numbers finally line up
- One contact stays with your order through specification, packing, spares and export
Most buyers do not lose money on price. They lose it on an uncomparable quote.
The quote you cannot compare
One supplier quotes a bare machine, another includes the charger, a third is actually quoting a deposit. The numbers look comparable. They are not.
The spec that quietly changes
Battery chemistry, mast section count, controller — the things that decide the real cost are the things most easily left off a quotation.
The factory you never verify
Anyone can forward a listing. Verifying a route means confirming what is actually built, by whom, and what happens when a part wears out.
You describe the job once. We do the searching.
A trading company can only offer what it happens to stock. Send us one requirement and it goes out to the factories that actually build that machine — so the choice you get is the market’s, not one seller’s.
The job comes first
Load, aisle width, throughput, power supply, destination. That settles which machines are even worth pricing — before anyone quotes you.
Who can actually build it
We trace the machine to the factories that genuinely make it, not the listings that merely resell it. You see each option’s region and background.
What they can prove
Component sources, wear parts, packing, export paperwork. If a factory cannot evidence something, we do not repeat it back to you as fact.
Numbers that line up
Same capacity, same battery, same charger, same terms — quoted side by side, so you can compare like for like instead of guessing.
Start with the job, not a model number.
Each line is organised the way buyers actually choose: by the machine type and the specification that matters, not by supplier listings.

Electric Counterbalance, Stackers & Pallet Trucks
1–5 ton electric forklifts, stackers, pallet trucks, self-loading and diesel routes for warehousing, food plants, container work and yards. Compare on capacity, battery, mast and charger.

Band Sealers, Vacuum Packing, Can Seamers & Bags
Continuous band sealers, chamber and external vacuum packers, can seamers, filling machines and packaging consumables for food and industrial use.
What actually happens, and what you end up holding.
No forwarding a pile of links and wishing you luck. The buying conditions get settled before anyone quotes.
We pin down the job
You tell us load, lift height, aisle, power and destination. We come back with a written brief — and the questions you would otherwise have learned the hard way.
You see real options
The shortlist is quoted on one identical specification, each with the evidence behind it. You compare like for like instead of guessing which quote is honest.
We stay on it to the port
Configuration, packing, accessories and wear parts agreed together, then export handoff. One checklist, one contact, nothing to chase.
The price question, answered honestly.
Buyers tell us the hardest part of sourcing from China is quotes that cannot be compared. Here is how we handle it.
One configuration, comparable quotes
Every supplier route is quoted on the same capacity, lift height, battery and charger — so the numbers mean the same thing.
Reference prices, clearly labelled
Starting prices shown on this site are estimates for direction only, excluding freight and final configuration. They are never presented as firm offers.
No invented certifications
If a document is required, we obtain it from the supplier and share the document name and issuing party — not the word “certified”.
What you can see before you pay.
Specifications, loading plans, real-time prices and factory credentials are obtained and verified — we do not guess to fill gaps.
Buyer concerns, answered
Battery replacement cost, spare parts, certification, container loading, lead time, used vs new, buy vs lease, voltage fitment — each concern gets a straight answer with the information we need to verify it.
FAQ →Factories we have actually checked
Every option in front of you comes from a factory we have checked. Where a name cannot be verified, you get the region and the evidence instead of a claim you cannot test.
Supply Chain →Enter by the question you actually have
Not knowing where to start is normal. The entries below map to the questions buyers most often arrive with.
Common questions, straight answers.
Is MekSource a factory?
No. MekSource is a China-based sourcing and coordination partner. We clarify your application, compare suitable supplier routes, and coordinate specifications, quotation, packing, spare parts and export handoff. We do not impersonate a single factory.
Can you recommend equipment from 1 photo?
A photo helps explain the application, but output, dimensions, utilities, cleaning, workflow, destination and packing still need confirmation before we compare routes.
Are website prices final?
No. The site shows reference starting prices for direction only. Final price depends on the confirmed configuration, freight, payment terms and a current supplier quotation — which we obtain and verify before presenting.
Can you compare several suppliers for me?
Yes. That is the core of what we do. We compare routes on one identical configuration and show what each includes, so the numbers mean the same thing.
Not sure which specification you need?
You do not need a finished specification. Send what you know — a photo, an output figure, a destination — and we will identify the next useful questions.
